Buying solar panels for a project: BIS, ALMM, 5% GST and quotes
How to buy solar PV modules in India: BIS registration, the ALMM lists for modules and cells, 5% GST and the 70:30 rule for turnkey projects, comparing quotes per watt-peak and red flags.
7 min read

In this article
Solar PV modules sold in India must be registered with BIS, model by model. Eligible projects, including net-metering and open-access projects, must also use modules from MNRE's Approved List of Models and Manufacturers (ALMM) (TaiyangNews, 20 July 2026 (opens in a new tab)). GST on photovoltaic cells and modules is 5% (Notification 9/2025-Central Tax (Rate) (opens in a new tab)). Compare quotes per watt-peak for the same technology, warranties and paperwork.
Key facts
- Crystalline silicon PV modules (IS 14286 with IS/IEC 61730 Parts 1 and 2), thin-film modules and PV inverters (IS 16221 Part 2) are on BIS's Compulsory Registration Scheme list, under the Solar Photovoltaics, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2017 notified by MNRE (BIS Scheme-II list (opens in a new tab), last updated 26 October 2026).
- Notification 9/2025-Central Tax (Rate) lists "photo voltaic cells, whether or not assembled in modules or made up into panels" among renewable energy devices in its 2.5% schedule, which gives 5% with state tax (Notification 9/2025-Central Tax (Rate) (opens in a new tab)).
- ALMM List-II, for solar cells, came into force on 1 June 2026. MNRE has allowed net-metering and open-access projects commissioned up to 31 December 2026 to stay exempt from List-II (TaiyangNews, 20 July 2026 (opens in a new tab)).
BIS registration
Each module model must be registered under the Compulsory Registration Scheme. The module or its packing must carry the BIS Standard Mark with the registration number (it starts with R) and the Indian Standard, plus the model number (BIS marking requirements for registered products (opens in a new tab)). Check the R-number on BIS's registration portal (crsbis.in) or the BIS Care app, and make sure the model and wattage on the registration match the modules quoted. Inverters for the same project need their own registrations.
ALMM and project rules
The ALMM framework requires eligible projects to use modules from ALMM List-I, and since 1 June 2026, modules made with cells from List-II. For net-metering and open-access projects, MNRE has given relief from List-II for projects commissioned up to 31 December 2026; projects commissioned after that must comply (TaiyangNews, 20 July 2026 (opens in a new tab)).
These rules change often and differ by scheme. If your project depends on a subsidy, net metering or open access, confirm with your DISCOM or project developer which list the modules and cells must be on before you sign the purchase order, and ask the supplier for proof that the exact model is listed.
Specifications to compare
- Rated power in watt-peak (Wp) and module efficiency.
- Cell technology, for example mono PERC or TOPCon, and single-sided or bifacial.
- Power tolerance: a positive-only tolerance means no module is below its label rating.
- Temperature coefficient of power: a smaller loss per degree helps in hot weather.
- Product warranty (defects) and performance warranty (output after a stated number of years), and who honours them in India.
- Size and weight, which decide the mounting structure.
Ask for the flash test report: the measured output of each module by serial number.
How to compare quotes on landed cost
- Price per watt-peak. Divide each quote by the total Wp delivered, not by the number of modules.
- Same specification. Compare the same technology, tolerance and warranty terms.
- Freight, insurance and unloading. Modules are fragile; ask for delivered rates with transit insurance and agree who bears breakage.
- GST. Modules on their own carry 5%. When the goods come together with other supplies including a taxable service named in the notification, as in a turnkey contract, the notification deems 70% of the total value to be the goods and 30% the service, so ask your CA how the full contract will be taxed.
- Paperwork. Count the registration proof, ALMM evidence and flash test data as part of the deal.
GST rate and HSN code
Photovoltaic cells and modules fall under HSN 8541. The entry for renewable energy devices in Schedule I of Notification 9/2025-Central Tax (Rate) covers chapters 84, 85 and 94 and includes solar power-based devices, solar power generators and PV cells, whether or not assembled in modules or made up into panels, at 2.5% central tax, so 5% in total. When these goods are supplied along with other goods and services, one of them a taxable service named in the entry, the entry deems 70% of the gross consideration to be the value of the goods and 30% the value of the service (Notification 9/2025-Central Tax (Rate) (opens in a new tab)). The IGST rate is 5% (Notification 9/2025-Integrated Tax (Rate) (opens in a new tab)).
Questions to ask suppliers
- What is the R-number for this module model, and in whose name is it registered?
- Is this exact model on ALMM List-I, and are the cells on List-II? Can you show the listing?
- Can you share the flash test report for the modules you dispatch?
- What are the product and performance warranties, and who handles claims in India?
- Is the price per watt-peak or per module, and does it include GST, freight and insurance?
- How will the modules be packed, and who pays for breakage in transit?
Red flags
- No R-number on the module label, or an R-number registered to a different model or wattage.
- "ALMM approved" claims with no listing for the exact model.
- No flash test data, or flash data that does not match the serial numbers delivered.
- Warranties honoured only by an overseas company with no claim process in India.
- A price per module with no total watt-peak stated.
- A request to pay a personal bank account or UPI ID that does not match the supplier's GST-registered name.
How Indibaba can help
Tell Indibaba AI what you need, for example "TOPCon modules about 550 Wp, BIS registered, ALMM listed, 200 kWp total, delivered to Ahmedabad", or use the requirement form. Indibaba AI drafts the requirement and nothing goes to suppliers until you confirm it. It reaches suppliers listed under solar panels and the RFQ market, where other sellers can quote. Indibaba is new, so some categories still have few suppliers. Suppliers that Indibaba has checked carry the Indibaba Certified badge; others show "Not checked yet". See also our solar panels quick guide.
Rules as of 17 November 2026. This article explains public rules in plain English. For a decision about your business, check the official notification or ask your CA.
Frequently asked questions
What is the GST rate on solar panels?
5%. Photovoltaic cells, whether or not assembled in modules or panels, are listed among renewable energy devices in the 2.5% central tax schedule of Notification 9/2025-Central Tax (Rate). When modules are supplied with a taxable service named in the notification, as in a turnkey contract, 70% of the value is treated as goods and 30% as the service.
Do solar panels need BIS registration?
Yes. Crystalline silicon and thin-film PV modules are on BIS's Compulsory Registration Scheme list. Each model needs its own registration, shown as an R-number with the Standard Mark on the module or its packing.
What is ALMM List-II?
It is MNRE's approved list for solar cells. Since 1 June 2026, eligible projects must use modules made with List-II cells. Net-metering and open-access projects commissioned up to 31 December 2026 have been given relief from this requirement.
How should I compare solar module quotes?
Convert each quote to a price per watt-peak delivered, for the same cell technology, tolerance and warranties. Add freight, insurance and GST, and count the registration, ALMM and flash test paperwork as part of the offer.
Sources
We checked the facts in this article against these sources on 17 November 2026.
- Products under compulsory registration, Scheme-II (including solar PV modules and inverters) (opens in a new tab), Bureau of Indian Standards, last updated 26 October 2026. Read on 17 November 2026.
- Marking requirements under the Compulsory Registration Scheme (Scheme-II), with the gazette text (opens in a new tab), Bureau of Indian Standards, 6 September 2019. Read on 17 November 2026.
- Notification No. 9/2025-Central Tax (Rate) (opens in a new tab), Central Board of Indirect Taxes and Customs (CBIC), 17 September 2025. Read on 17 November 2026.
- Notification No. 9/2025-Integrated Tax (Rate) (opens in a new tab), CBIC, 17 September 2025. Read on 17 November 2026.
- MNRE grants ALMM relief for net-metering, open access (opens in a new tab), TaiyangNews (third party), 20 July 2026, reporting MNRE's notification of 18 July 2026. Read on 17 November 2026.